Ninh BìnhAI & Cloud Data Center Campus
A 30 MW Tier III campus in the Mỹ Thuận Industrial Park, built in three 10 MW phases on cleared, flood-free land about 80 km from Hanoi. Two 110 kV substations sit within 2 km of the site, and power at the factory tariff is among the cheapest in Asia.
IT capacity by phase
Each phase starts only when its capacity is contracted.
- Campus
- 3 × 10 MW
- Grid nodes
- 2 × 110 kV
- Grid need
- ≈44 MVA
- To Hanoi
- ≈80 km
- Target PUE
- ≤ 1.4
- Land
- 2.5–3 ha, ready
One hall opens; two more follow on contract
- Hall 1 · Phase 110 MW, liquid-ready for AI racks, with rooftop solar.
- Halls 2 and 3Pads and corridors reserved; built when capacity is signed.
- On-site 110/22 kV substationTwo 63 MVA transformers, fed from Mỹ Thuận and Hiển Khánh.
- Rear utility yardN+1 generators, 48 h of fuel and UPS rooms behind each hall.
- Two fiber entriesSeparate duct routes from two carriers, entering on opposite sides.
An AI-ready campus at the edge of the Hanoi market
Hanoi is Vietnam's government, banking and AI hub, but land and grid capacity near the capital are scarce. Mỹ Thuận offers what Hanoi cannot: cleared land ready to hand over, two 110 kV substations within 2 km, a factory power tariff of about US$0.073 per kWh and road access to the capital in under two hours.
The engineering basis matches TORmem's Da Nang, Gia Lai and Quang Trung campuses: Tier III concurrent maintainability, 2N UPS, diverse fiber and a staged, demand-led build.
Power, land and incentives are favourable. Three issues decide the project: data centers must be added to the park's permitted industries, EVN must commit a dedicated 110 kV supply instead of the 22 kV offered, and a second carrier must bring diverse fiber. Proceed to a 4–9 month bankable feasibility phase that closes these before final investment.
| Lead developer | TORmem (California, USA) |
| Project company | Vietnamese project company; data center services carry no foreign-ownership cap under the 2023 Telecommunications Law |
| Land terms | One of six 2–3 ha plots, sub-leased from the park developer; one-time payment of US$110–125/m² to 30 September 2071 |
| IT capacity | 30 MW in three phases of 10 MW, each triggered by contracted demand |
| Grid connection | Dedicated 110 kV supply to an on-site 2 × 63 MVA substation; full campus needs about 44 MVA |
| Reliability | Tier III, concurrently maintainable, as a minimum |
| Facility investment | US$88–99 million for Phase 1, including land; US$212–239 million for 30 MW |
| Timeline | Phase 1 ready about month 32; full 30 MW about month 56 |
Why Ninh Bình, and why Mỹ Thuận
Close to Hanoi
The park sits on National Roads 21 and 21B, with links to Road 10 and the North–South Expressway. Hanoi is about 80 km away; Hai Phong port and Nội Bài airport about 100 km.
110 kV within 2 km
Hiển Khánh 110 kV (2 km, about 63 MVA spare today) and the new Mỹ Thuận 110 kV (0.2 km, 2 × 63 MVA, in service Q3 2027). EVN Ninh Bình has committed 180 MW to the park.
Cleared and flood-free
Six plots of 2–3 ha are cleared, levelled and ready to hand over, with no recorded flooding. The park covers 158.6 ha and is about 56% occupied.
Low-cost power
From 1 November 2026 the factory tariff above 35 kV averages about VND 1,879 per kWh around the clock, roughly half Malaysia's and a quarter of Singapore's commercial rates.
Top-tier incentives
Under the Digital Technology Industry Law 71/2025, AI data centers are a specially encouraged sector. GPU servers, UPS and chillers may be exempt from import duty.
Water and wastewater
Two water plants supply 5,000 m³ per day at about US$0.60/m³. The wastewater plant takes 5,000 m³ per day today and is licensed for 15,000.
Where Ninh Bình fits
Da Nang leads on subsea cables, Gia Lai on raw power. Ninh Bình is the northern campus: cheap power and ready land within reach of Hanoi's banks, government suppliers and AI companies.
| Ninh Bình · Mỹ Thuận IP | Da Nang Hi-Tech Park | Gia Lai campus | |
|---|---|---|---|
| Site | 2.5–3 ha in a working industrial park | About 2.5 ha in the Hi-Tech Park | 3–5 ha greenfield parcel |
| Land terms | One-time payment, US$110–125/m², to 2071 | 50-year lease; land-rent exemption requested | Rent at a discount to market |
| Phase 1 IT | 10 MW | 10 MW | 10 MW |
| Campus | 30 MW (3 × 10 MW) | 30 MW (3 × 10 MW) | 40 MW (4 × 10 MW) |
| Grid | Two 110 kV substations within 2 km; about 44 MVA needed | Dedicated 110 kV; about 44 MVA | 220 kV node; about 57 MVA |
| Connectivity | Domestic backbone to Hanoi; only VNPT at the gate today | APG and ALC land in the city | ADC and SJC2, Quy Nhơn |
| Workloads | AI inference and training near Hanoi, data residency, disaster recovery | AI anchor, sovereign cloud, DR, colocation | AI training for an anchor |
| Main open issue | Park zoning must add data centers | High-tech classification | Grid upgrade timing |
| Ready for service | ≈ month 32 | ≈ month 32 | ≈ month 36 |
Three 10 MW phases, built as demand is signed
Phase 1 builds the site platform, the 110 kV substation for the full campus, the operations building and the first 10 MW hall. Each later phase adds a self-contained hall with its own generators, UPS and cooling.
- Phase 110 MW
Hall 1, liquid-ready for AI racks. Carries the shared works: substation, platform, fiber entries, operations building and meet-me rooms.
≈ month 32 · anchor signed for 4–5 MW - Phase 2+10 MW
Hall 2 with its generators, UPS and cooling, added without interrupting Phase 1.
≈ month 44 · starts at 70% of Phase 1 leased - Phase 3+10 MW
Hall 3 and matching plant; the campus is complete. Neighbouring land can be held for later growth.
≈ month 56 · 30 MW total
Roads, security, water, fiber ducts and substation bays for all three phases are reserved on day one. Capital for Phases 2 and 3 is released only when that capacity is contracted.
Who the campus serves
| Customer | Share | Contract |
|---|---|---|
| Anchor AI or GPU cloud | 40–50% | 5–10 years, take-or-pay; a Hanoi AI company, a regional GPU cloud or a telco's AI service |
| Enterprise and data residency | ≈25% | 3–5 years; Hanoi banks, insurers and government suppliers that must keep data in Vietnam |
| Disaster recovery | 10–15% | 1–3 years; a second site outside Hanoi's grid and flood zone |
| Retail racks and cages | ≈10–15% | 1–3 years; Red River Delta manufacturers and software firms |
Target mix for each 10 MW phase. There is no data center in the park yet, so the anchor customer must be signed before financial close.
AI and standard halls
About 30% of each hall is a liquid-cooled zone for 40–80 kW GPU racks. The rest serves 10 kW cloud and enterprise racks with contained air cooling. The anchor's hardware sets the final split.
Commercial model
Customers reserve kW on long contracts and pay a fixed monthly capacity fee. Electricity is metered and billed at EVN cost times PUE, so customers carry power-price risk and the capacity fee repays the debt.
Competitive edge
Against Hanoi sites: available land and 110 kV capacity. Against Johor: a similar rent but power about 40% cheaper, data kept in Vietnam, and a 1–2 ms link to Hanoi users.
Priced at Johor levels, with cheaper power
Proposed prices excluding VAT, at USD 1 = VND 25,800. A cost-based price for Ninh Bình is US$116–187 per kW per month before power, depending on build cost, return and occupancy; the list price sits near the low end to compete with Johor.
| Service | US$ | VND | Terms |
|---|---|---|---|
| Wholesale capacity, anchor (2 MW+) | 120–140 / kW / month | 3.10–3.61M / kW / month | 5–10 years, take-or-pay; list price US$130 |
| High-density GPU capacity | 150–170 / kW / month | 3.87–4.39M / kW / month | 5–10 years; premium pays for liquid cooling |
| Private suite or cage (100–500 kW) | 160–190 / kW / month | 4.13–4.90M / kW / month | 3–5 years |
| Power, factory tariff | ≈69–74 / kW / month | ≈1.8–1.9M / kW / month | EVN tariff × PUE + 5% handling, metered monthly |
| Power, if business tariff applies | ≈106–114 / kW / month | ≈2.7–2.9M / kW / month | About 54% more; tariff class to be confirmed by EVN |
| Retail rack (42U, 5 kW, power included) | ≈800 / month | 20.6M / month | 1–3 years |
| Cross-connect | ≈100 / month | 2.6M / month | Per connection |
| Remote hands | ≈50 / hour | 1.3M / hour | First 2 hours a month free for wholesale customers |
Wholesale rent before power, by market
US$ per kW per month (= US$ thousand per MW per month) · CBRE and market sources, 2026
Ranges shown at midpoint. No consultant publishes a wholesale rent for the Gulf; UAE retail power add-ons run about US$270–680 per kW, and Saudi operators earn about US$2–3 million per MW a year.
- Revenue per phase
- $13.3M 8.5 MW leased × US$130
- EBITDA per phase
- ≈$10.6M Power passed through at cost
- Full campus EBITDA
- ≈$32M 30 MW, 85% leased
- Return on capital
- ≈14% On US$226M midpoint
If the build costs Turner & Townsend's Vietnam index of US$8.32 per watt instead of TORmem's US$7.0–7.8 million per MW, the return falls to about 11%. If EVN applies the business tariff, the all-in price rises by about US$40k per MW per month and competes less well with Johor.
2.5 hectares hold all three phases
Three two-storey halls sit side by side, with the utility yard behind them, the substation at the end nearest the Mỹ Thuận 110 kV station and the operations building facing the park road.
Three data halls (2 storeys)
9,000 m²3,000 m² footprint per hall · Phase 1 built, Phases 2 and 3 reserved
Substation and utility yard
4,500 m²110/22 kV substation, generators, fuel and water tanks, UPS rooms
Heat rejection
3,000 m²Chillers, dry coolers and, once water is confirmed, cooling towers
Operations building
1,500 m²Lobby, network operations center, two meet-me rooms, offices
Roads, security and landscaping
7,000 m²Ring road, loading dock, parking, guardhouse, drainage and setbacks
Site rules and requirements
- Planning limits: 60–70% site coverage, a floor-area ratio of 0.6–3.5 and no fixed height limit, so two-storey halls fit easily.
- Candidate plots: CN3-2, CN5-2, CN11-1, CN12-1, CN12-2 and CN12-3; a plot near the Mỹ Thuận substation shortens the 110 kV line.
- Expansion: ask the park for first refusal on the neighbouring plot for growth beyond 30 MW.
- Generators, fuel tanks and rooftop plant: the park has not yet confirmed these are allowed; get written approval.
- Geotechnical survey is the investor's responsibility. The park does not normally allow surveys before signing, so negotiate access in the MOU.
- Floor level raised above the local flood line even though the site has no recorded flooding.
Areas are planning estimates. The final layout follows the surveyed plot and the anchor customer's requirements.
The campus in renderings
Concept renderings of the TORmem campus design from October 2026, shared with the Da Nang and Gia Lai campuses. All 13 renderings are shown, including the site plan above. The final layout will follow the surveyed Mỹ Thuận plot.
Aerial view from the main road
Aerial view from the opposite corner
Rear view: power and cooling yard
Rear view of the utility yard
Front aerial: data halls and central entrance
Main entrance and lobby
Street frontage with solar carports
Entrance plaza
Main entrance, TORMEM Data Center
Street elevation
Front gate and security post
Solar carports along the fence
The Tier III design basis
Tier III minimum
Concurrently maintainable; Uptime design and constructed-facility certification, 99.982% target.
On-site 110 kV substation
Two 63 MVA transformers, N+1, fed from two 110 kV stations; A/B paths; 2N Li-ion UPS.
N+1 generators
2.5–3 MVA diesel or HVO sets with 48 hours of fuel on site.
Air, liquid and water
Chillers with economizers for cool winters; direct-to-chip loops for AI racks.
Two carriers
VNPT plus a second carrier, Viettel or FPT, on physically separate routes to Hanoi.
Storm-rated envelope
Roof, façade and plant rated for Red River Delta typhoons; raised floor level.
Five layers
On top of the park's guards, police liaison and 24/7 road CCTV: own fence, biometrics, CCTV; ISO 27001.
Park brigade on site
Two fire trucks and a dedicated fire main at 80 m head and 360 m³/h, plus in-hall gas suppression.
The power is nearby; the connection must be 110 kV
EVN Ninh Bình has offered 22 kV lines to the plot fence. At PUE 1.4, 30 MW of IT draws about 44 MVA, far more than 22 kV feeders should carry. The campus needs its own 110/22 kV substation fed from both Mỹ Thuận and Hiển Khánh, built once in Phase 1 for all three phases.
Grid demand as each phase is added
MVA at power factor 0.95 and PUE 1.4, against spare capacity at Hiển Khánh today and the firm capacity of the on-site substation
Hiển Khánh has about 63 MVA spare today (2 machines, 40% loaded). Mỹ Thuận 110 kV adds 2 × 63 MVA from Q3 2027, before Phase 1 is ready. Other park tenants also draw on both stations, so EVN must confirm how much is already promised.
- IT load
- 30 MW Three 10 MW phases
- Facility demand
- 39–42 MW PUE 1.3–1.4
- Grid demand
- 41–44 MVA At power factor 0.95
- Annual energy at 80%
- ≈294 GWh ≈US$21M a year at the factory tariff
Grid today
- Hiển Khánh 110 kV, two transformers totalling about 103 MVA, 2 km from the park, about 40% loaded.
- Mỹ Thuận 110 kV, 2 × 63 MVA, 0.2 km from the park, under construction; completion December 2026, in service Q3 2027. It is in the revised Power Development Plan VIII.
- No dry-season cuts. The park says the area has priority supply and has not been curtailed in dry seasons.
- Cost split: EVN pays for lines to the plot fence; the investor builds the substation on its own plot and contracts directly with EVN Ninh Bình.
- Tariff from 1 November 2026: factory rate above 35 kV is VND 1,792 normal, 1,123 off-peak and 3,218 peak per kWh. Peak is 17:30–22:30, Monday to Saturday; off-peak is 00:00–06:00.
Renewable supply
The park allows rooftop solar on the plot, and the design carries solar on every hall roof and carport. For larger volumes, a direct power purchase agreement over EVN's grid can supply renewable energy with traceable certificates.
What EVN must confirm
- Load forecast
Demand by phase submitted to EVN Ninh Bình: 15, 30 and 44 MVA. The park will arrange the meeting.
- Capacity letter
About 44 MVA at 110 kV from two stations, signed by EVN and the park management board, before the land deal becomes unconditional.
- Connection agreement
Line route from Mỹ Thuận and Hiển Khánh, asset ownership, energization date and EVN approval of the substation design.
- Tariff class
Written confirmation of the factory tariff, not the business tariff, which costs about 54% more around the clock.
One carrier at the gate; a second is essential
VNPT has built underground ducts to the plot fence, and two independent routes are possible through VNPT. A data center needs a second carrier on a separate route, and international capacity reaches the north over the domestic backbone from landings in Da Nang and Quy Nhơn.
Indicative round-trip latency
Milliseconds, estimate · about 10 µs per km of fiber round trip, before equipment delay
Scale 0–40 ms; lighter segment shows the upper end of the range. Estimates only: the park will answer on latency and international bandwidth after meeting the carriers.
Network plan
- VNPT, already at the park gate with ducts to each plot: first route.
- Viettel or FPT on a physically separate route, entering on the opposite side of the plot: required before final investment.
- Hanoi interconnection at a carrier-neutral Hanoi data center for cloud on-ramps and peering.
- International paths through two different landing cities, so one cable fault does not cut service.
In August 2026 four international cables serving Vietnam were impaired at the same time, including SJC2 and AAE-1. Contracts should require capacity on at least two cable systems and a service level that covers cable cuts.
Cool winters help; water is available
The Red River Delta has hot, humid summers near 35°C but cool winters that give economizer hours from December to March. With 5,000 m³ of water a day available, evaporative cooling is an option here, unlike in water-limited sites.
| Option | Fit for Ninh Bình | Use on this campus |
|---|---|---|
| Air-cooled chillers with economizers | Works year-round; free cooling in winter; low water use | Base cooling, 10 kW racks |
| Direct-to-chip liquid (CDU loop) | Handles 40–80 kW racks; warm return water extends economizer hours | AI zone, ≈30% of each hall |
| Evaporative cooling towers | Most efficient; park water supply of 5,000 m³/day, discharge temperature limits apply | If the water letter confirms supply |
| Immersion | Highest density; specialist supply chain | Pilot only, if a tenant asks |
The park has not yet answered whether liquid cooling and water-treatment chemicals face any limits; this goes into the data-room questions.
Land, investment and the path forward
The plot is sub-leased from the park developer for a one-time payment that fixes the land cost to 2071. There is no land-rent exemption, because the land is paid upfront, but the total is small next to the building cost.
| Term | Offered by the park |
|---|---|
| Lessor | Park infrastructure developer (sub-lease); land lease decision signed by the Ninh Bình People's Committee |
| Area | 2.5–3 hectares from six suitable plots |
| Price | US$110–125 per m², one payment (Q4 2026); about US$2.8–3.8 million in total |
| Running fee | US$0.70 per m² per year for management and infrastructure upkeep |
| Term | To 30 September 2071, about 45 years; extension depends on state policy then |
| Zoning | Gate Data centers (VSIC 6310) are not in the park's permitted industries; the park's planning must be amended |
| Licensing | Investment certificate within 3 days of a complete file if the developer prepares it; construction permit from the park management board |
| MOU | No deposit; land held for 3 months; deposit refunded if power, water or roads are late |
| Financing | Land rights cannot be mortgaged to banks that are not licensed in Vietnam |
| Disputes | Vietnamese courts; international arbitration not accepted so far |
What Ninh Bình gains
- Investment. US$212–239 million of facility investment over three phases, the park's first data center.
- Digital infrastructure. A new 110 kV substation, carrier-neutral meet-me rooms and diverse fiber that other tenants can use.
- Skilled jobs. About 40–60 permanent staff per phase, with 250–400 construction workers at peak, trained with regional universities and FPT's planned Nam Định campus.
- A northern digital hub. AI and backup capacity for Hanoi on Ninh Bình land, supporting the province's high-tech industry goals.
An anchor customer's U.S.-origin AI hardware may need export authorization. The park could not yet advise on GPU import procedures, so export counsel, vendor confirmation and any licence come before hardware commitments.
Indicative facility investment
US$ million · including land, excluding customer IT hardware and financing costs
Scale 0–240. TORmem's basis of about US$7.0–7.8 million per MW, plus US$2.8–3.8 million for land. Phase 1 carries the substation, 110 kV line, platform and operations building. Includes about 11% contingency; to be refined by a quantity surveyor at concept design.
| Risk | Impact | Mitigation |
|---|---|---|
| Park zoning not amended for data centers | Critical | Amendment approved before any land payment; MOU conditional on it |
| EVN offers only 22 kV, or 110 kV late | Critical | Capacity letter at 110 kV before land deal; Phase 1 tied to Mỹ Thuận station in service |
| No anchor customer | Critical | No financial close without a signed anchor for 4–5 MW |
| Single carrier at the gate | High | Second carrier contract and separate route before final investment |
| Business tariff applied | High | Written tariff class from EVN; customers carry power cost under pass-through |
| Financing limits and court-only disputes | Medium | Lenders licensed in Vietnam; negotiate arbitration in the investor agreements |
| Typhoon and flooding | Medium | No recorded flooding; raised floor level and storm-rated envelope |
| Later phases not contracted | Medium | Phases 2 and 3 built only at 70% of the prior phase leased |
Phase 1 is ready about month 32; the full 30 MW about month 56
Indicative schedule, months from signing the MOU · Phases 2 and 3 start only on contracted demand
The zoning amendment period is an estimate; the park has not given a timeline. The MOU's 3-month land hold should be extended to cover it.
Eight gates before final investment
Proceed to a 4–9 month bankable feasibility phase. No construction notice or unconditional land or capital commitment until these are met.
- 01 · MOU
Land hold and data room
MOU on one of the six plots, with the hold extended past the zoning amendment, plus plot maps, utility drawings and draft sub-lease.
- 02 · Zoning
Data centers permitted
The park's planning amended to add data centers (VSIC 6310), approved in writing by the province.
- 03 · Power
EVN 110 kV letter
About 44 MVA at 110 kV from Mỹ Thuận and Hiển Khánh, co-signed by EVN Ninh Bình and the management board, with the tariff class.
- 04 · Network
Second carrier
Viettel or FPT on a separate route, latency tests to Hanoi and international capacity on two cable systems.
- 05 · Site
Plot studies
Geotechnical and topographic surveys, flood review, written water and wastewater letters, and approval for generators and fuel.
- 06 · Incentives
AI data center status
Written confirmation of incentives under Law 71/2025 and Decree 353/2025, corporate tax treatment and the import-duty equipment list.
- 07 · Customer
Anchor letter of intent
An anchor for 4–5 MW of Phase 1, with authorized hardware supply and end-use approvals.
- 08 · Economics
Bankable model
Cost plan within ±5%, equipment quotes, onshore financing, tax opinion and a downside test at the business tariff.